Send Message

Carbon /Alloy steel pipes, ERW steel pipes, API 5L LSAW&SSAW, ASME B16.9/MSS SP-75 BW pipe fittings, ASME B16.5/16.47 steel flanges, ASME B16.11/MSS SP-97 forged fittings, Knife gate valves, Butterfly valves, Ball valves,Globe valves,API valves

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home News

Ordering Information~ASTM A480

I'm Online Chat Now
Certification
China Hebei Lufeng Piping Equipment Co., Ltd. certification
China Hebei Lufeng Piping Equipment Co., Ltd. certification
Company News
Ordering Information~ASTM A480
Latest company news about Ordering Information~ASTM A480
ASTM A480/A480M General Requirements for Flat-Rolled Stainless and Heat-Resisting Steel Plate, Sheet, and Strip
 
Ordering Information
 
It is the responsibility of the purchaser to specify all requirements that are necessary for material ordered under this specification. Such requirements may include, but are not limited to, the following:
 
1. Quantity (weight and number of pieces),
2. Name of material (stainless steel),
3. Condition (hot-rolled, cold-rolled, annealed, heat-treated),
4. Finish; in the case of polished finishes, specify whether one or both sides are to be polished,
5. Temper (if the applicable material specification requires this detail),
6. Form (plate, sheet, or strip),
7. Dimensions (thickness, width, and length),
7.1 Thickness shall be ordered to decimal or fractional thickness. The use of the gauge number is discouraged as being an archaic term of limited usefulness not having general agreement on meaning. The gauge number shall not be a basis for rejection.
7.2 Thickness, width, and length, when applicable, should be ordered in the same units, for example, 0.060 by 48 by 120 in. [1.52 by 1219 by 3048 mm].
8. Edge, strip only,
9. Type or UNS designation, refer to the applicable material specification,
10. Specification designation and date of issue,
11. Additions to specification or special requirements,
12. Restrictions (if desired) on methods for determining yield strength,
13. Marking requirements,
14. Preparation for delivery, and
15. Magnetic permeability test (when required).
Pub Time : 2023-07-13 16:09:44 >> News list
Contact Details
Hebei Lufeng Piping Equipment Co., Ltd.

Contact Person: Mr. Sam Cui

Tel: +86 130 3189 1590

Send your inquiry directly to us