logo
Send Message

Carbon /Alloy steel pipes, ERW steel pipes, API 5L LSAW&SSAW, ASME B16.9/MSS SP-75 BW pipe fittings, ASME B16.5/16.47 steel flanges, ASME B16.11/MSS SP-97 forged fittings, Knife gate valves, Butterfly valves, Ball valves,Globe valves,API valves

Sales & Support
Request A Quote - Email
Select Language
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home ProductsSteel Pipes & Tubes

ERW Square Welding Steel Pipe/Galvanized Rectangular Tube/Rectangular Pipe For Construction Materials

I'm Online Chat Now
Certification
China Hebei Lufeng Piping Equipment Co., Ltd. certification
China Hebei Lufeng Piping Equipment Co., Ltd. certification

ERW Square Welding Steel Pipe/Galvanized Rectangular Tube/Rectangular Pipe For Construction Materials

ERW Square Welding Steel Pipe/Galvanized Rectangular Tube/Rectangular Pipe For Construction Materials
ERW Square Welding Steel Pipe/Galvanized Rectangular Tube/Rectangular Pipe For Construction Materials

Large Image :  ERW Square Welding Steel Pipe/Galvanized Rectangular Tube/Rectangular Pipe For Construction Materials Get Best Price

Product Details:
Place of Origin: Cangzhou, China (Mainland)
Payment & Shipping Terms:
Packaging Details: Standard sea-worthy packing: 1. oiled; 2. oiled with pvc film; 3. oiled with plastic bags.
Detailed Product Description

The specification

 

 

Welded Round Steel Pipe and Tube Specification (mm)
φ13×0.6~1.5 φ27×1.1~3.0 φ89×1.5~6.0 φ219×2.0~12.0
φ16×0.6~2.0 φ32×1.1~4.0 φ114×1.5~6.0 φ273×3.0~12.0
φ19×0.6~3.0 φ42×1.1~4.0 φ140×2.0~6.0 φ325×3.0~12.0
φ20×0.6~3.0 φ48×1.4~5.0 φ159×2.0~6.0 φ377×3.0~12.0
φ22×1.1~2.5 φ60×1.4~6.0 φ168×2.0~6.0 φ426×3.0~12.0
φ25×1.1~2.75 φ76×1.5~6.0 φ180×2.0~8.0 φ508×3.0~12.0

 

ERW Square Welding Steel Pipe/Galvanized Rectangular Tube/Rectangular Pipe For Construction Materials 0

 

Packaging & Delivery

Packaging Details: Standard sea-worthy packing:
1. oiled;
2. oiled with pvc film;
3. oiled with plastic bags.
Delivery Detail: 7 - 20 days

Tips: Packing suggestion for lounge furniture steel pipe
A: Time on board ≤ 20 days (oiled on surface of pipe)
B: Time on board ≥ 20 days (with pvc film or plastic bags wrapping after oiled)

Contact Details
Hebei Lufeng Piping Equipment Co., Ltd.

Contact Person: Sam

Tel: +8613031891590

Send your inquiry directly to us